Page 1 of 1

Why is a power delivery test performed?

Posted: 30 Aug 2011, 21:31
by joro
Why is a power delivery test performed, even if Forward power levelling is not selected?

Re: Why is a power delivery test performed?

Posted: 30 Aug 2011, 21:31
by joro
When RadiMation® is instructed to use the forward power meter it will always perform a power delivery test.

The following items that may cause a forward power measurement:

Forward power amplifier protection was activated.
The forward power or net power is measured as an input.
Forward power or Net power calibration method is selected.
In all these cases, also a power delivery test is performed.