For ech test site you can define a "Before Action" and "After Action" actions.
However for example, if you have divided you frequency range in different sub-frequency ranges and use the same test site in these sub-frequency ranges the "Before Action" and "After Action" actions won't be executed in the between frequency ranges anymore. Is this normal?
I would expect and like that these actions also appear at the sub-frequency ranges.
Test site "before" and "after" actions
Re: Test site "before" and "after" actions
Dear Henk,
Originally the before and after actions are created for (de-)initializing test equipment.
Since the same test-site is being used, the (de-)initialization can be skipped and so the before and after actions in between can as well.
I have created a new item: #8449 Force to always show before and after actions for each band.
If you duplicate the test site, by saving it to a different name. And then use a duplicated test-sites for each band. Does the before and after actions show up at every band switch?
Originally the before and after actions are created for (de-)initializing test equipment.
Since the same test-site is being used, the (de-)initialization can be skipped and so the before and after actions in between can as well.
I have created a new item: #8449 Force to always show before and after actions for each band.
If you duplicate the test site, by saving it to a different name. And then use a duplicated test-sites for each band. Does the before and after actions show up at every band switch?