Why is a power delivery test performed?

This forum contains all kind of frequently asked questions.
Post Reply
User avatar
joro
Posts: 441
Joined: 24 Aug 2011, 09:55
Contact:

Why is a power delivery test performed?

Post by joro »

Why is a power delivery test performed, even if Forward power levelling is not selected?
User avatar
joro
Posts: 441
Joined: 24 Aug 2011, 09:55
Contact:

Re: Why is a power delivery test performed?

Post by joro »

When RadiMation® is instructed to use the forward power meter it will always perform a power delivery test.

The following items that may cause a forward power measurement:

Forward power amplifier protection was activated.
The forward power or net power is measured as an input.
Forward power or Net power calibration method is selected.
In all these cases, also a power delivery test is performed.
Post Reply