EUT test status pass

Discussions and question about the general functionality of RadiMation
Post Reply
mahe
Posts: 18
Joined: 17 May 2016, 12:06

EUT test status pass

Post by mahe »

In the EUT window, executed tests are listed.
For each tests a Test Status icon is by default visible. This will show a flag when a test is finished running.
When a test is not finished running, a green triangle will be visible.
The Test Status does not indicate if the test has run succesfully or failed.

For the Radiated Emission, Conducted Emission and Pulsed Immunity tests we have added a Test passed indicator to the list of tests:
Test passed indicator
Test passed indicator
TestPassIcons.png (45.99 KiB) Viewed 6611 times

To show this indicator follow these steps:

1: Open the column chooser in the EUT window Test List by right clicking the column bar.
Column Chooser
Column Chooser
ColumnChooser.png (48.3 KiB) Viewed 6611 times
2: Drag the Test passed Icon column to the list of tests
Drag Column
Drag Column
Column Drag.png (32.87 KiB) Viewed 6611 times
The Test passed indicator is changed according the following rules.
When a emmision test has no failed peaks, the test is passed:
Emission Test
Emission Test
PeakFailed.png (12.26 KiB) Viewed 6611 times
When all sequences in a pulsed immunity test is marked as passed:
PITest
PITest
TestFailed.png (34.1 KiB) Viewed 6611 times
Post Reply