EUT test status pass

Posted: 15 Nov 2016, 16:52
by mahe
In the EUT window, executed tests are listed.
For each tests a Test Status icon is by default visible. This will show a flag when a test is finished running.
When a test is not finished running, a green triangle will be visible.
The Test Status does not indicate if the test has run succesfully or failed.

For the Radiated Emission, Conducted Emission and Pulsed Immunity tests we have added a Test passed indicator to the list of tests:
Test passed indicator
Test passed indicator
TestPassIcons.png (45.99 KiB) Viewed 9397 times

To show this indicator follow these steps:

1: Open the column chooser in the EUT window Test List by right clicking the column bar.
Column Chooser
Column Chooser
ColumnChooser.png (48.3 KiB) Viewed 9397 times
2: Drag the Test passed Icon column to the list of tests
Drag Column
Drag Column
Column Drag.png (32.87 KiB) Viewed 9397 times
The Test passed indicator is changed according the following rules.
When a emmision test has no failed peaks, the test is passed:
Emission Test
Emission Test
PeakFailed.png (12.26 KiB) Viewed 9397 times
When all sequences in a pulsed immunity test is marked as passed:
PITest
PITest
TestFailed.png (34.1 KiB) Viewed 9397 times