Emission - Measure time in Multiband and Singleband

Discussion and questions regarding the Radiated Emission and Conducted Emission modules of RadiMation.
Post Reply
quangvu
Posts: 2
Joined: 14 Dec 2019, 04:58

Emission - Measure time in Multiband and Singleband

Post by quangvu »

1. In Multiband
Im not sure about the difference between meaure time in "Receiver setting" and in "Final peak measurement"
How can I set this time for EUT?
2. In Single band for testing absorbing clamp
Im not sure about the difference between meaure time in "Receiver setting" and in "Detector"
How can I set this time for EUT?
Attachments
88748e10f4f60da854e7.jpg
88748e10f4f60da854e7.jpg (20.28 KiB) Viewed 4118 times
d959cdacb84a4114185b.jpg
d959cdacb84a4114185b.jpg (21.72 KiB) Viewed 4118 times
User avatar
joro
Posts: 440
Joined: 24 Aug 2011, 09:55
Contact:

Re: Emission - Measure time in Multiband and Singleband

Post by joro »

In our RadiMation end-user manual, a description is given for the different 'Measure time' boxes:
quangvu
Posts: 2
Joined: 14 Dec 2019, 04:58

Re: Emission - Measure time in Multiband and Singleband

Post by quangvu »

Thank you for answering my questions.
But im feel not clarify. According to your answer, the first value is time constant of detector. I know, for example quasi peak detector have charing time constant and discharging time constant. Which one to be choose in the first value?
And, How can I set the measure time "The time of recevier"? Which standard or EUT i have to based on to chose measure time?
Thank you so much. Hope to get your answer.
Post Reply