Test site "before" and "after" actions

Discussion and questions regarding the Radiated Emission and Conducted Emission modules of RadiMation.
Post Reply
heutink
Posts: 70
Joined: 22 Sep 2016, 11:23

Test site "before" and "after" actions

Post by heutink »

For ech test site you can define a "Before Action" and "After Action" actions.
However for example, if you have divided you frequency range in different sub-frequency ranges and use the same test site in these sub-frequency ranges the "Before Action" and "After Action" actions won't be executed in the between frequency ranges anymore. Is this normal?

I would expect and like that these actions also appear at the sub-frequency ranges.
mahe
Posts: 18
Joined: 17 May 2016, 12:06

Re: Test site "before" and "after" actions

Post by mahe »

Dear Henk,

Originally the before and after actions are created for (de-)initializing test equipment.
Since the same test-site is being used, the (de-)initialization can be skipped and so the before and after actions in between can as well.

I have created a new item: #8449 Force to always show before and after actions for each band.

If you duplicate the test site, by saving it to a different name. And then use a duplicated test-sites for each band. Does the before and after actions show up at every band switch?
Post Reply